Total Productive Maintenance and Quick Changeover (SMED) Workshop

photo

This course will teach the principles of Total Productive Maintenance and Quick Changeover (SMED). TPM and SMED are two essential ingredients in a lean manufacturing program. The TPM system addresses production operation with a team-based proactive program. It helps eliminate losses from breakdowns, defects, and accidents and improves Overall Equipment Effectiveness (OEE). The SMED system for quick changeover is a three-phase system aimed at reducing changeover time on equipment; this allows for smaller batches and less inventory throughout the value stream.



Total Productive Maintenance and Quick Changeover (1 Day)

Next Session: May 10, 2017

Time: 8:30am - 4:30pm

Location: Doubletree Club Hotel Orange County Airport, 7 Hutton Centre Drive, Santa Ana, CA

Instructor: Darren Dolcemascolo

Price: $449 (early registration - 2 weeks prior to session) / $549 (regular registration)

 

Registration powered by RegOnline

Price includes books, materials, and lunch at instructor-led sessions.


If you would like to bring this workshop on-site to your facility, contact us.
Total Productive Maintenance and Quick Changeover Outline
  • SMED/Quick Changeover
  • Identifying Internal versus External Setup
  • Converting Internal to External Setup
  • Streamlining External and Internal Setup steps
  • Overview: Process Kaizen Tools
  • Why TPM is Important
  • The Big Six Losses
  • Measuring and analyzing Overall Equipment Effectiveness (OEE).
  • Autonomous Maintenance/TPM Teams
  • Daily/Weekly Maintenance Tasks
  • TPM and 5S
  • TPM and Teams
  • TPM and Problem Solving Techniques